Well Isolation

Well Isolation

TPE offers a temporary chemical gel plug which is used to isolate wellbore and producing interval for a predefined period of time. The main application of gel plug is to separate the productive layer from the well column in order to create the suitable condition and prevent fluid loss into formation and reduce or eliminate formation damage to oil and gas wells during workover and completion operations.

Date

21 October 2020

Tags

TPE