Well Isolation

Gel Plug

BENEFITS

  • Temporary blocking of well without using mechanical equipment or cement plug.
  • Possibility of operation simulation in the laboratory.
  • Creating a gel plug for temporarily blocking the well in order to perform workover operations such as casing running.
  • Easily removing the gel plug after operation completion using chemical solutions.
  • Better securing the wells in operations in which blocking with mechanical or cement plug procedures are not applicable.
  • Reducing the operation time in comparison with mechanical and cement plug procedures.

 

TPE offers a temporary chemical gel plug that is used to isolate wellbore and producing interval for a predefined period of time. The main application of the gel plug is to separate the productive layer from the Well column in order to create a suitable condition and prevent fluid loss into formation and reduce or eliminate formation damage to oil and gas wells during workover and completion operations.


Print   Email

Related Articles

Stimulation

About Us

Home