Well Isolation

Gel Plug

BENEFITS

 

TPE offers a temporary chemical gel plug that is used to isolate wellbore and producing interval for a predefined period of time. The main application of the gel plug is to separate the productive layer from the Well column in order to create a suitable condition and prevent fluid loss into formation and reduce or eliminate formation damage to oil and gas wells during workover and completion operations.

Related Articles

Stimulation

About Us

Home